Include the irrigation application in the construction sequence.
Johnson City publishes an irrigation permit application process. Confirm the requirements for the project address and coordinate that review with the irrigation professional before beginning installation. Where the work accompanies a new building, identify the water connection and landscape layout as dependencies rather than treating irrigation as an isolated final task.
Show zones, valves and pavement crossings on the coordinated plan. Include applicable testing and inspection steps, a record of the installed layout and controller instruction in the handover. For commercial properties, identify the party responsible for ongoing access and records. If planting or paving changes during construction, reconcile the system design before the trenches are closed.
Local reference: Johnson City planning and permits. Confirm requirements for your address and scope with the responsible authority.
