Design the zones around the finished landscape.
Austin Water separates watering guidance by equipment and property use. Identify the actual supplier and account category early, then plan controller operation for the completed landscape rather than a generic installation schedule.
Send the planting plan, lawn boundaries, planned paths, and future outdoor structures together. Discuss separate needs for beds and turf, service access to valves, and the handover information the owner or manager will need. On commercial work, coordinate trenching with occupied access and other underground improvements before the construction sequence is fixed.
Local reference: Austin Water watering-day guidance. Confirm requirements for your address and scope with the responsible authority.