Protect underground routes when planning the enclosure.
A Dripping Springs fence project should begin with more than a boundary measurement. Map known private water, irrigation and wastewater lines alongside the intended post locations. Texas811 coordination is an early step, and the owner should identify privately maintained infrastructure that may require separate locating.
Bring the survey and mark gates used by residents, customers and maintenance crews. Compare the fence line with drainage crossings and existing tree areas before finalizing the layout. Confirm city, county and association requirements applicable to the address. During replacement, specify temporary security, removal of old footings and restoration of adjacent planting so the quoted scope covers the full transition.
Local reference: Texas811 excavation coordination. Confirm requirements for your address and scope with the responsible authority.
