Make commissioning part of the installation scope.
Cedar Park’s irrigation page provides guideline, ordinance and backflow-report resources. Include the applicable review and handover steps in the scope from the beginning. A system is more useful when the owner receives a clear zone map, controller instructions and a record of the installed layout.
For new construction, coordinate sleeves and crossings before paving closes off access. For a renovation, distinguish retained components from new ones. Separate turf and planted-bed requirements in the planning discussion, identify accessible valve locations, and arrange appropriate testing and documentation rather than treating commissioning as an informal final walkthrough.
Local reference: Cedar Park irrigation information. Confirm requirements for your address and scope with the responsible authority.
